Quick answer. The difference between a renewable energy demonstration and an experiment is whether the incoming resource is measured, and it is the item most often left out of a quotation. A solar trainer reporting volts, amps and watts shows what the panel produced, not how well it worked, because efficiency needs the irradiance arriving and the module temperature. A wind trainer needs wind speed at the rotor and rotor speed, or no power coefficient can be calculated. A fuel cell needs the gas flow in. So for each of RET-0001 to RET-0017, ask which of these measurements are included before comparing anything else.
Seventeen units, coded RET-0001 to RET-0017, in three subjects. Photovoltaic: a solar energy unit trainer, systems for an isolated site, a cabled kit, a unit with power export to the electrical utility, a solar pumping station, and apparatus for the production and study of solar electric energy. Fuel cells: an educational PEM fuel cell and an educational alkaline fuel cell. Wind: study benches for a wind machine, wind turbine study frames, a unit for the study of wind turbine electric energy and a wind turbine for an isolated site.
Two notes on our catalogue text. Several records differ only by a trailing digit or by a word or two, and the listing uses "windmill" and "wind turbine" for what is the same class of machine; some names also read awkwardly in English and are being rewritten. Ask for the specification of each record you are choosing between, and quote the code and the full product name together.
This is the difference between a renewable energy demonstration and a renewable energy experiment, and it is the thing most often left out of a quotation.
A solar trainer that reports volts, amps and watts tells a student what the panel produced. It cannot tell them how well the panel worked, because efficiency is output divided by the energy arriving, and the energy arriving has to be measured. The same is true of wind: without a wind speed, the power coefficient cannot be calculated, and the power coefficient is the whole of wind turbine theory at this level.
| Subject | What must be measured besides the electrical output | Without it |
|---|---|---|
| Photovoltaic | Irradiance, by a pyranometer or a calibrated reference cell, and module temperature | No efficiency, and no way to show the two effects that matter most in a hot climate - that output rises with irradiance and falls as the module heats up |
| Wind | Wind speed at the rotor, by anemometer, and rotor speed | No power coefficient, no tip-speed ratio, and no way to show the optimum - which is the central result of the subject |
| Fuel cell | Gas flow in, and ideally the electrical energy used to produce it | No conversion efficiency, and no way to compare a fuel cell honestly against a battery |
Ask us, unit by unit, whether a pyranometer or reference cell, a module temperature sensor, an anemometer and a gas flow measurement are included, and what each costs if it is not. Ask also whether the unit can plot a current-voltage curve, because the I-V curve is where the physics of a solar cell lives - a trainer that only reports a single operating point cannot show the maximum power point, which is the thing a maximum power point tracker exists to find.
A photovoltaic module cannot be switched off. It produces voltage whenever light falls on it, including daylight through a window and including the room lights. There is no off switch, so a module is isolated by covering it opaquely or by disconnecting it, and every student must be told that before they are taught anything else. On a trainer with modules wired in series, the open-circuit voltage of the string can be high enough to matter even at small sizes - ask what the string voltage is.
Direct current behaves differently from mains alternating current when a connection is broken. An alternating current arc extinguishes itself at every zero crossing; a direct current arc does not, which is why solar installations use purpose-made DC isolators, connectors and fuses rather than ordinary ones, and why a connector pulled apart under load can sustain an arc. Ask what isolator and connectors the trainer uses, insist that students break connections only with the array covered, and ask whether reverse polarity is protected, because getting polarity wrong is the commonest student error on these rigs.
And the battery, which is the part that will fail first. Any isolated-site or stand-alone system has storage, and a teaching battery gets deep-cycled by students in a way no real installation would. Ask what type it is, its expected cycle life and its replacement cost, and budget for replacing it. A vented lead-acid battery gives off hydrogen on charge and needs ventilation with no ignition sources nearby; a lithium battery is a dangerous good for transport and needs its test documentation if it ships with the unit. Ask which you are getting.
One unit in this listing sends power to the electrical utility, and that is a regulated act rather than a wiring exercise. Connecting a generator to a public supply normally requires an inverter approved to the grid-connection standard of that country, and usually an agreement with the utility before it is energised. A teaching rig cannot simply be plugged into a socket and back-fed, and a laboratory that does so may be in breach of its own electrical licence as well as the utility rules.
There are two honest routes, and it is worth choosing deliberately. Either the unit is specified for grid connection and you obtain the approvals - in which case ask us which standard the inverter is certified to and whether the certificate covers your country - or the unit exports into a simulated grid, an isolated alternating current source within the laboratory, which teaches synchronisation, power factor and export control without touching the public supply at all. For most teaching programmes the second route is the right one. Tell us which you want before the order is made up.
The two fuel cells teach the same principle with quite different practicalities.
The PEM cell needs hydrogen, and hydrogen is flammable across an unusually wide range in air, is odourless and burns with a nearly invisible flame. For a teaching laboratory the far safer arrangement is an electrolyser that produces hydrogen on demand from water, because it holds almost none at any moment - ask whether the unit includes one or expects a cylinder. If a cylinder is involved, the laboratory needs high-level ventilation, restraint, no storage in cupboards or with oxidisers, and leak testing with fluid or an electronic detector rather than a flame. Ask also about the water: a PEM stack is damaged by impure water and by being allowed to dry out, so ask what water quality it requires and what the storage procedure is between terms.
The alkaline cell uses a caustic electrolyte, typically potassium hydroxide, which is corrosive to skin and eyes and damaging to clothing. It needs gloves, eye protection, a spill procedure, a neutralising agent to hand, and a defined route for disposing of spent electrolyte. Ask what concentration is used, how it is supplied and refilled, and whether it can be imported.
For both: membranes, electrodes and stacks are consumables with finite lives and they are the running cost of the equipment. Ask what a replacement stack or membrane costs and what its expected service life is in a teaching setting, where it will be started and stopped far more often than in service.
The wind units need a source of moving air, and the fan or blower is effectively the power supply of the experiment - which sets the honest limits. Ask what air source is included, what wind speed range it produces and how uniform the flow is across the rotor, because a non-uniform flow makes a power curve unrepeatable. Ask the rotor diameter, whether blades can be changed or pitched, how rotor speed is measured, how the generator is loaded, and what guard surrounds the rotor.
And be clear about what the rig teaches. An indoor wind trainer demonstrates principles - tip-speed ratio, power coefficient, the effect of blade pitch and number, and the shape of the power curve - rather than site performance. It cannot predict what a turbine would produce at a real location, and a result from it should not be presented as though it could. For the system side, see also the green technology trainers range, and for electrical measurement and bench supplies, the electrical and electronics workshop range.
Rated output of each unit and its operating voltage; whether irradiance, module temperature, wind speed, rotor speed and gas flow are measured and by what; whether an I-V curve can be plotted and whether maximum power point tracking is included or demonstrated; string voltage and the isolator and connector types; battery type, capacity, cycle life and replacement cost; for the grid-export unit, the inverter certification and whether a simulated grid option exists; for the fuel cells, hydrogen source, water quality, electrolyte concentration and stack replacement cost and life; for the wind units, air source, wind speed range, rotor diameter, loading and guarding; data logging and software with licence terms; services at the position; mass, footprint and whether the solar modules are indoor-lamp or outdoor-mounted; consumables and spares with prices; and the warranty, commissioning and local service position. For any certification stated here, contact us for the latest copies of the relevant certificates before you tender on it.
Related ranges: machines for thermodynamics and power plant apparatus, heat transfer lab apparatus for solar thermal fundamentals, and process control and instrumentation for control and data acquisition. The full set is listed under engineering apparatus. For a quotation, tell us the destination country, whether the solar units will be used indoors under lamps or outdoors, whether grid export is required, and the class size in one practical session.
Two things besides electrical output. Irradiance, by a pyranometer or a calibrated reference cell, and module temperature. Without them there is no efficiency figure and no way to show the two effects that matter most in a hot climate: output rises with irradiance and falls as the module heats up. Ask, unit by unit, whether both sensors are included. Then ask whether the trainer can plot a current-voltage curve, because the I-V curve is where solar cell physics lives; a unit reporting a single operating point cannot show the maximum power point a tracker exists to find.
Not simply. Sending power to the electrical utility is a regulated act: it normally requires an inverter approved to your country's grid-connection rules and usually an agreement with the utility before the unit is energised. A teaching rig back-fed into a socket may breach both the utility rules and your own electrical licence. There are two honest routes. Either specify the unit for grid connection and obtain the approvals, contacting us for the latest copies of the relevant inverter certificates, or export into a simulated grid inside the laboratory. For most teaching programmes the simulated grid is right.
Two. A photovoltaic module cannot be switched off: it produces voltage whenever light falls on it, including daylight through a window and room lighting, so it is isolated by covering it opaquely or disconnecting it, and every student hears that first. And direct current arcs do not self-extinguish the way alternating current arcs do at each zero crossing, which is why solar work uses purpose-made DC isolators, connectors and fuses. Ask the string voltage, which isolator and connectors the trainer uses, and whether reverse polarity is protected; students break connections only with the array covered.
Ask, because the battery is the part that will fail first: a teaching battery is deep-cycled by students in a way no real installation would be. Ask its type, capacity, expected cycle life and replacement cost, and budget for replacing it. The type changes the room and the shipment. A vented lead-acid battery gives off hydrogen on charge and needs ventilation with no ignition sources nearby. A lithium battery is a dangerous good for transport and needs its test documentation if it ships with the unit. Confirm which you are getting before the order is made up.
They teach the same principle with different practicalities. The PEM cell needs hydrogen, which is flammable over a wide range in air, odourless and burns with a nearly invisible flame; an electrolyser making hydrogen on demand from water is far safer than a cylinder, so ask which the unit uses. The PEM stack is also damaged by impure water and by drying out. The alkaline cell uses a caustic electrolyte, typically potassium hydroxide, needing gloves, eye protection, a spill procedure and a disposal route. For both, ask stack or membrane replacement cost and expected life in teaching use.
Principles rather than site performance: tip-speed ratio, power coefficient, the effect of blade pitch and blade number, and the shape of the power curve. It cannot predict what a turbine would produce at a real location, and its results should not be presented as if they could. The fan or blower is effectively the power supply, so ask what air source is included, its wind speed range and how uniform the flow is across the rotor, since non-uniform flow makes a power curve unrepeatable. Ask the rotor diameter, whether blades can be changed or pitched, how rotor speed is measured and what guard surrounds the rotor.
Ray Export is a manufacturer and exporter of laboratory, scientific and educational equipment based at Plot No. 449, HSIIDC Industrial Area, Saha, Ambala, Haryana 133104, India. Enquiries: [email protected], +91-9817319615.
Written by Palak Mall, Senior Content Writer. Technically reviewed by Arvind Kumar, Lab Equipment Specialist, 12+ years in laboratory and testing instrumentation. Last updated: 17 October 2026.
Specifications for each unit - rated output and voltage, which quantities are measured and by what, I-V curve and tracking capability, string voltage, battery type and cycle life, hydrogen source, electrolyte concentration, air source and wind speed range - are confirmed in writing on the quotation. For inverter, battery transport or other certificates, standards or approvals, contact us for the latest copies of the relevant certificates. No price is quoted on this page. Listing note: several records among RET-0001 to RET-0017 differ only by a trailing digit or a word or two; the listing uses windmill and wind turbine for the same class of machine; and some names read awkwardly in English and are being rewritten.
Photovoltaic Solar Energy Unit for the investigation of the change, specialized showing gear for building of sun powered vitality in electric vitality. Photovoltaic Solar Energy Unit utilizes the photograph transformation close planetary system for the immediate change of sunlight based radiation into power. The assimilated vitality is given by reenacted sun oriented radiation; for our situation, this is finished by methods for a board with capable light sources..
Educational PEM Fuel Cell , technical teaching equipment for engineering
Educational Alkaline Fuel Cell, technical teaching equipment for engineering
Production and study of the solar electric energy, technical teaching equipment for engineering
Photovoltaic solar energy in isolated site, technical teaching equipment for engineering
Study bench of a windmill, technical teaching equipment for engineering
Wind turbine study frame, technical teaching equipment for engineering
Study of wind turbine electric energy, technical teaching equipment for engineering
Production and study of solar electric energy, technical teaching equipment for engineering
Photovoltaic cabled kit in isolation, technical teaching equipment for engineering