science lab equipment manufacturer

Industrial Training Kits

Industrial Training Kits

We cater our clients with latest and standardized Industrial Training Kits.

CORIOLLI'S COMPONENTS OF ACCELERATION APPARATUS

ITK-0018

Extent OF EXPERIMENTATIONS: 


· To decide Coriolli's Component of Acceleration at different velocities of turn and water stream rates. 


UTILITIES REQUIRED: 


· Water Supply. 


· Drain. 


· Electricity 


o 0.5 kW, 220 V, Single Phase 


Specialized DETAILS: 


· Main Tank 


o Fabricated out of Stainless Steel 


· Rotating Arms 


o 9mm/6mm hole distance across, Length 300 mm. 


· Rotameter 


o 250 to 2500 LPH 


· Electric Motor 


o Swinging field compose, Variable speed. 


· Pump 


o FHP 


· Control Panel Comprises of 


o RPM estimation 


§ RPM Indicator with Proximity sensor. 


o Speed Control Unit. 


o Standard make On/Off Switch, Mains Indicator, and so on. 


· The entire set-up is all around planned and organized in a decent quality painted structure.

Solid Liquid Extraction Bed Type

ITK-0002

With strong responsibility to quality, we are occupied with offering great quality, Solid Liquid Extraction (Packed Bed Type) . These are outlined under the strict charge of our quality analyzers remembering the business rules. After creation, these items are stringently tried on shifted grounds, to guarantee their consistence with global quality norms. 


Highlights: 


Strength 


High elasticity 


Protection from consumption

Mass Transfer Lab Equipment

ITK-0003

We are instrumental in offering better quality Mass Transfer Lab Equipment than the regarded clients, according to their particular requests. These mass exchange labs are outlined in such a way, to the point that our customers' correct necessities get satisfied by us. What's more, we have picked up ability in offering redid items to the customers. 


Application Area Of Product: 


Strong Liquid Extraction (Packed Bed Type) 


Ingestion in Wetted Wall Column 


Stuffed Distillation Column 


Air pocket Cap Distillation Column 


Straightforward STEAM Distillation Set-up 


Swenson Walker Crystallizer 


Ingestion in Packed Bed 


Fluid Liquid Extraction in Packed Bed 


Strainer Plate Distillation Column 


Splash Extraction Column 


Ingestion in Sieve Plate Column 


Fluidized Bed Dryer 


Vapor in Air Diffusion Apparatus 


Constrained Draft Tray Dryer 


Settled Bed Absorption with Regeneration 


Strong in Air Diffusion Apparatus 


Regular Draft Tray Dryer 


York Scheibel Extraction Column 


Fluid in Liquid Diffusion Apparatus 


Revolving Dryer 


Clump Crystallizer 


Mass Transfer with/without Chemical Reaction 


(Strong Liquid System) 


Strong Liquid Extraction (Bonnoto compose) 


Vapor-Liquid Equilibrium Set-Up 


Wetted Wall Column, Humidification and De-Humidification Study 


Test Water Cooling Tower 


Particle Exchange

Adsorption in Packed Bed

ITK-0004

Utilities Required: 


Water Supply and Drain 


Power Supply: I Phase, 220VAC, 1.5kW 


Instruments, Laboratory Glassware and Chemicals required for examination according to the framework received 


Determinations: 


Item 


Adsorption Setup 


Reactor Column 


Material Borosil Glass, diverse distance across with various tallness of pressing (3 Nos.) 


Feed Tank 


Material Stainless Steel, Capacity 20 Ltrs., feed lines, deplete valve and so forth. (1Nos.) 


Getting Tank 


Material Stainless Steel, Capacity 20 Ltrs (1Nos.) 


Feed Circulation 


By pump, Magnetic drive made of Polypropylene (1Nos.) 


Stream Measurement 


Rota-meter 1 Nos. (for feed) 


Feed Piping 


PVC/SS estimate 


Stop Watch 


Electronic 


Control Panel 


On off switch, Mains Indicator and so on. 


The setup is painted with great quality paints and mounted on a solid help.

Bubble Cap Distillation Column

ITK-0005

The setup is intended to exhibit standards of refining in a Bubble Cap section. 


The segment is made of Stainless Steel with seven plates for mounting the air pocket tops. Each plate is given one air pocket top. An electrically warmed re-kettle is introduced at the base of the section. The vapors shape the highest point of segment are dense in the shell and tube write condenser by coursing cooling water provided by lab overhead tank. 


The condensate is partitioned into reflux and distillate via programmed reflux divider and R/D Ratio can be changed. Reflux is nourished back to the segment and distillate is gotten in a getting tank. The entire section is protected for limiting the warmth misfortune. Instrumentation is improved the situation weight and temp estimation wherever is fundamental 


Analyses 


To consider the Bubble Cap Distillation Column 


Highlights 


Treated Steel tanks and wetted parts 


Magnificent Painted structure 


Easy to work and keep up 


Conservative and remain solitary set up 


Utilities Required 


Water Supply 2 LPM at 5 m head 


Deplete 


Power Supply: 1Phase, 220 V AC, 6.5 kW 


Required Chemicals 


Refractrometer for investigation

Natural Draft Tray Dryer

ITK-0006

The set-up is intended to exhibit and fortify the dampness expulsion by warm under normal draft activity made by hot air stream. 


The set-up comprises of a protected twofold divider chamber. Inside the chamber a plate is joined specifically to an electronic measuring balance, which is fitted on top outside the chamber. Material for drying is put in the plate and standard loss of weight is checked. Air fills in as the drying operator by characteristic activity expels the dampness from the plate by going towards the best openings. A computerized temperature controller is utilized to control and measure the temperature of air stream l 


Trials 


Assurance of rate of drying of wet sawdust under various states of temperature 


Highlights 


Sublime Painted structure 


Easy to work and keep up 


Minimal and remain solitary set up 


Utilities Required 


Electric supply Provide 230 +/ - 10 VAC, 50 Hz, single stage electric supply with appropriate earthing. 5A, three stick attachment with switch for measuring scale, 15A, three stick attachment with switch for warmer 


Material Saw clean @ 1Kg. 


Bolster table Size: 500Wx500Dx750H in mm

Forced Draft Tray Dryer

ITK-0007

The set-up is intended to show and fortify the dampness evacuation by warm under constrained draft activity made by hot air stream. 


The set-up comprises of a protected twofold divider chamber. Inside the chamber a plate is connected specifically to an electronic measuring balance, which is fitted on top outside the chamber. Material for drying is set in the plate and customary loss of weight is observed. Air from blower goes through warming chamber to create hot air fills in as the drying specialist entered from one side of the chamber and leave the chamber from opposite side expels the dampness from the plate. A game plan is made to fluctuate and measure the wind current rate. A computerized temperature controller is utilized to control and measure the temperature of air stream. 


>Experiments 


Assurance of rate of drying of wet sawdust under various states of temperature and wind current 


Highlights 


Wonderful Painted structure 


Easy to work and keep up 


Minimized and remain solitary set up 


Utilities Required 


Electric supply Provide 230 +/ - 10 VAC, 50 Hz, single stage electric supply with appropriate earthing. 5A, three stick attachment with switch for measuring scale, 15A, three stick attachment with switch for radiator 


Material Saw clean @ 1Kg. 


Anemometer Air stream estimation

Fluidized Bed Dryer 1

ITK-0008

The set-up is intended to show and animate the dampness expulsion by warm under constrained draft activity made by hot air stream and fluidization property of strong to dry. 


The set-up comprises of an exceptionally composed, vertical Column. The lower cone shaped segment of the section is loaded with sodden solids. The material is bolstered on the screen work held between two spines. Air from blower goes through warming chamber to deliver hot air functions as the drying specialist entered from bring down side of the segment and leave the segment from top outlet expels the dampness of solids. At the best outlet of section a violent wind is given to gather the strong particles taken out by the air stream. A plan is made to change and measure the wind stream rate. A computerized temperature controller is utilized to control and measure the temperature of air stream 


Investigations 


To ponder the fluidized bed drying 


Highlights 


Heavenly Painted structure 


Easy to work and keep up 


Reduced and remain solitary set up 


Utilities Required 


Electric supply Provide 230 +/ - 10 VAC, 50 Hz, single stage electric supply with legitimate earthing. 5A, three stick attachment with switch for measuring scale, 15A, three stick attachment with switch for radiator 


MaterialSaw clean @ 1Kg. Granular and free streaming strong of size I - 2 mm 


Anemometer Air stream estimation

Liquid Liquid Extraction In Packed Bed

ITK-0009

The setup is intended to exhibit standards of fluid extraction and mass move activity in a pressed section. 


The set up comprises of a glass segment, pressing, feed tanks, air controller with weight measure, getting tanks and channeling. Rotameter are accommodated stream estimation 


Examinations 


Assurance of general stature of an exchange unit and general volumetric mass exchange coefficient 


Highlights 


Treated Steel tanks and wetted parts 


Extraordinary course of action for changing stature of interface zone 


Consistent activity 


Wonderful Painted structure 


Easy to work and keep up 


Minimized and remain solitary set up 


Utilities Required 


Electric supply Provide 230 +/ - 10 VAC, 50 Hz, single stage electric supply with legitimate earthing. 5A, three stick attachment with switch for Compressor 


Synthetic compounds for preliminary according to your decision 


Packed Air supply: Clean, oil and dampness free air, weight 2 Bar. 


Water Supply and Drain as required

York Scheibels Extraction Column

ITK-0010

The setup is intended to show standards of extraction and mass move activity in a YORK SCHEIBEL'S section. 


The set up comprises of a glass section, feed tanks, air controller with weight measure, accepting tanks and funneling. Rotameter are accommodated stream estimation. 


The glass segment is partitioned into different stages; each stage comprises of a woven wire work (quieting) area and a mechanical disturbance segment. The fomenter speed can be shifted by drive. The nearness of on the other hand fomenting and quieting areas yield higher extraction effectiveness than customary pressed segment 


Examinations 


Assurance of general stature of an exchange unit and general volumetric mass exchange coefficient 


Highlights 


Treated Steel tanks and wetted parts 


Extraordinary course of action for changing stature of interface zone 


Ceaseless activity 


Sublime Painted structure 


Easy to work and keep up 


Conservative and remain solitary set up 


Utilities Required 


Electric supply Provide 230 +/ - 10 VAC, 50 Hz, single stage electric supply with legitimate earthing. 5A, three stick attachment with switch for Compressor 


Synthetic compounds for preliminary according to your decision 


Packed Air supply: Clean, oil and dampness free air, weight 2 Bar. 


Water Supply and Drain as required